<< October 2017 >>
S M T W T F S
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        
Regular Office Hours are:
8:00 AM to 4:30 PM
Home
News
Regulations
Collier Township Municipal Authority’s Code Manual
Maps
Contact
Additional Information
Sewer Billing Information

CTMA rules and regulations encompass the following:

-Deduct (Credit) Meters
-Dye Testing
-Grease Traps
-Connections to the Sanitary Sewer System (Tap-ins)
-Sewer Lateral Discontinuation



Uploaded "Regulations" Documents


PDF 04/14/11 Sanitary Sewer Easement Warning Letter
Check Before You Build Or Add To Your Property! You are not permitted to construct anything over or on top of a Sanitary Sewer Easement, with the exception of a sidewalk or a driveway. No Buildings, Sheds, Porches, Walls, etc. may be constructed in or over the Sanitary Sewer Easement.

PDF 03/30/09 Dye Tests / No Lien Letters
Dye tests are designed to verify that no illegal sewer connections exist. Dye tests are required for all new construction and all exchange of property, including refinancing. All dye test documentation must be received at least 12 business days before property scheduled closing date. Before a No-Lien letter can be issued, the property must pass a dye test performed by a Allegheny County licensed plumber. All repairs must be inspected by ACHD County's Representative and CTMA’s engineers, NIRA Consulting Engineers before a No-Lien letter can be issued. *Please see the "Municipal Authority Dye Test/No-Lien Letter Application" in the Applications section of CTMA's website for further details and instructions.*

PDF 01/08/09 Installation Of Holding Tanks In Collier Township
The installation of a sewage holding tank is regulated by the Allegheny County Health Department On-Lot Sewage Disposal program. Additionally, the Pennsylvania Code, Title 25, Chapters 71 and 73, strictly regulate the installation of a sewage holding tank within any municipality.

PDF 01/08/09 Sanitary Lateral Disconnect
Sanitary Lateral Disconnect from Septic System Diagram

PDF 01/08/09 Sanitary Lateral Connection
Sanitary Sewer Lateral Connection Diagram

PDF 11/13/08 Deduct (Credit) Meter
A typical situation for a credit meter would be the installation of a lawn sprinkling system, heavy use swimming pools, or commercial or manufacturing facilities.

PDF 06/19/08 Short Form Specifications
These specifications have been developed as a guide to assist Developers, Designers and Contractors involved in planning, designing and constructing sanitary sewerage facilities under the jurisdiction of the Collier Township Municipal Authority.

PDF 06/10/08 Grease Trap Regulations
Grease Traps and/or Interceptors are installed to limit the amount of grease discharged into the public sewer system to levels not exceeding those permitted by ALCOSAN. Grease traps and/or Interceptors are required for all businesses where food is prepared, cooked, sold, served or given with or without charge to customers or guests for their consumption

PDF 05/19/08 Landlord Advice
Please remember that when you rent or lease your property, you, as the owner of the property, are responsible for the payment of the sanitary sewer bill. The Municipal Authority has the right to file a Municipal Lien against your property for failure of your tenant to pay the sewer rental charges that appear on the water bills received by your tenant from the water company.

PDF 05/08/08 Policy and Rules for Public Participation in the Collier Township Municipal Authority Meetings
It is the policy of the Collier Township Municipal Authority to strongly encourage public participation, inasmuch as it provides the Board with an important source of ideas, as well as informs us of many concerns in our service area.



Need a PDF Reader?
Download it here:
   Get Adobe Reader
 
2418 HILLTOP ROAD • SUITE 200 • PRESTO, PENNSYLVANIA 15142 • PHONE: (412) 279-4941  • FAX: (412) 278-2001